HV.LP
|
HV Line Protection
|
HV.LP.DIF-1.A
|
Set 1 Line Differential Relay
Acceptance Test
|
HV.LP.DIF-1.F
|
Set 1 Line Differential Relay
Final Setting Test
|
||
HV.LP.DIF-2.A
|
Set 2 Line Differential Relay
Acceptance Test
|
||
HV.LP.DIF-2.F
|
Set 2 Line Differential Relay
Final Setting Test
|
||
HV.LP.DIST-1
|
Set 1 Distance Relay Test
|
||
HV.LP.DIST-2
|
Set 2 Distance Relay Test
|
||
HV.LP.MULTI-1.A
|
Main 1 Multifunction Relay
Acceptance Test
|
||
HV.LP.MULTI-1.F
|
Main 1 Multifunction Relay
Final Setting Test
|
||
HV.LP.MULTI-2.A
|
Main 2 Multifunction Relay
Acceptance Test
|
||
HV.LP.MULTI-2.F
|
Main 2 Multifunction Relay Final
Setting Test
|
||
HV.LP.AR
|
Automatic Recloser Relay Test
|
||
HV.LP.ASYNC
|
Auto Synchronizing Relay Test
|
||
HV.LP.THOL
|
Thermal Overload Relay Test For
Underground Cable
|
||
EHV.TRP
|
EHV Power Transformer Protection
|
EHV.TRP.DIF-1.A
|
Set 1 Differential Relay
Acceptance Test
|
EHV.TRP.DIF-1.F
|
Set 1 Differential Relay Final
Setting Test
|
||
EHV.TRP.DIF-2.A
|
Set 2 Differential Relay
Acceptance Test
|
||
EHV.TRP.DIF-2.F
|
Set 2 Differential Relay Final
Setting Test
|
||
EHV.TRP.REF-PR
|
Restricted Earth Fault Relay Test
- Primary Side
|
||
EHV.TRP.REF-SE
|
Restricted Earth Fault Relay Test
- Secondary Side
|
||
EHV.TRP.DIST-1
|
Set 1 Distance Relay Test
|
||
EHV.TRP.DIST-2
|
Set 2 Distance Relay Test
|
||
EHV.TRP.OFLUX
|
Over Flux Relay Test
|
||
EHV.TRP.OC-PR.A
|
Primary Side Overcurrent And Earth
Fault Relay Acceptance Test
|
||
EHV.TRP.OC-PR.F
|
Primary Side Overcurrent And Earth
Fault Relay Final Setting Test
|
||
EHV.TRP.OC-SE.A
|
Secondary Side Overcurrent And
Earth Fault Relay Acceptance Test
|
||
EHV.TRP.OC-SE.F
|
Secondary Side Overcurrent And
Earth Fault Relay Final Setting Test
|
||
EHV.TRP.OC-TER.A
|
Tertiary Winding Overcurrent And
Earth Fault Relay Acceptance Test
|
||
EHV.TRP.OC-TER.F
|
Tertiary Winding Overcurrent And
Earth Fault Relay Final Setting Test
|
||
EHV.TRP.CTSUP-1
|
Set 1 CT Supervision Relay
Test
|
||
EHV.TRP.CTSUP-2
|
Set 2 CT Supervision Relay
Test
|
||
EHV.TRP.MS
|
Metrosil Test
|
||
EHV.TRP.MULTI-1.A
|
Main 1 Multifunction Differential
Relay Acceptance Test
|
||
EHV.TRP.MULTI-1.F
|
Main 1 Multifunction Differential
Relay Final Setting Test
|
||
EHV.TRP.MULTI-2.A
|
Main 2 Multifunction Differential
Relay Acceptance Test
|
||
EHV.TRP.MULTI-2.F
|
Main 2 Multifunction Differential
Relay Final Setting Test
|
||
HV.TRP
|
HV Power Transformer Protection
|
HV.TRP.DIF-1.A
|
Set 1 Differential Relay
Acceptance Test
|
HV.TRP.DIF-1.F
|
Set 1 Differential Relay Final
Setting Test
|
||
HV.TRP.DIF-2.A
|
Set 2 Differential Relay
Acceptance Test
|
||
HV.TRP.DIF-2.F
|
Set 2 Differential Relay Final
Setting Test
|
||
HV.TRP.REF-PR
|
Restricted Earth Fault Relay Test
- Primary Side
|
||
HV.TRP.REF-SE
|
Restricted Earth Fault Relay Test
- Secondary Side
|
||
HV.TRP.OFLUX
|
Over-Flux Relay Test
|
||
HV.TRP.OC-PR.A
|
Primary Side Overcurrent And Earth
Fault Relay Acceptance Test
|
||
HV.TRP.OC-PR.F
|
Primary Side Overcurrent And Earth
Fault Relay Final Setting Test
|
||
HV.TRP.OC-SE.A
|
Secondary Side Overcurrent And
Earth Fault Relay Acceptance Test
|
||
HV.TRP.OC-SE.F
|
Secondary Side Overcurrent And
Earth Fault Relay Final Setting Test
|
||
HV.TRP.NA.A
|
Neutral Alarm Relay Acceptance
Test
|
||
HV.TRP.NA.F
|
Neutral Alarm Relay Final Setting
Test
|
||
HV.TRP.SEF.A
|
Standby Earth Fault Relay
Acceptance Test
|
||
HV.TRP.SEF.F
|
Standby Earth Fault Relay Final
Setting Test
|
||
HV.TRP.MULTI-1.A
|
Main 1 Multifunction Relay Acceptance Test
|
||
HV.TRP.MULTI-1.F
|
Main 1 Multifunction Relay Final Setting Test
|
||
HV.TRP.MULTI-2.A
|
Main 2 Multifunction Relay
Acceptance Test
|
||
HV.TRP.MULTI-2.F
|
Main 2 Multifunction Relay Final
Setting Test
|
||
HV.TRP.MS
|
Metrosil Test
|
||
EHV.SRP
|
EHV Shunt Reactor Protection
|
EHV.SRP.MULTI-1.A
|
Main 1 Multifunction Relay
Acceptance Test
|
EHV.SRP.MULTI-1.F
|
Main1 Multifunction Relay Final
Setting Test
|
||
EHV.SRP.MULTI-2.A
|
Main 2 Multifunction Relay
Acceptance Test
|
||
EHV.SRP.MULTI-2.F
|
Main 2 Multifunction Relay Final
Setting Test
|
||
EHV.SRP.DIF-1.A
|
Set 1 Differential Relay Acceptance Test
|
||
EHV.SRP.DIF-1.F
|
Set 1 Differential Relay Final Setting Test
|
||
EHV.SRP.DIF-2.A
|
Set 2 Differential Relay Acceptance Test
|
||
EHV.SRP.DIF-2.F
|
Set 2 Differential Relay Final Setting Test
|
||
EHV.SRP.OC.A
|
Overcurrent And Earth Fault Relay
Acceptance Test
|
||
EHV.SRP.OC.F
|
Overcurrent And Earth Fault Relay
Final Setting Test
|
||
EHV.SRP.NOC.A
|
Neutral Overcurrent Relay
Acceptance Test
|
||
EHV.SRP.NOC.F
|
Neutral Overcurrent Relay Final
Setting Test
|
||
EHV.SRP.REF
|
Restricted Earth Fault Relay Test
|
||
EHV.SRP.CTSUP-1
|
Set 1 CT Supervision Relay Test
|
||
EHV.SRP.CTSUP-2
|
Set 2 CT Supervision Relay Test
|
||
EHV.SRP.MS
|
Metrosil Test
|
||
EHV.LP.UV/OV
|
Undervoltage And Overvoltage Relay
Test
|
||
HV.SRP
|
HV Shunt Reactor Protection
|
HV.SRP.MULTI-1.A
|
Set 1 Multifunction Relay
Acceptance Test
|
HV.SRP.MULTI-1.F
|
Set 1 Multifunction Relay Final
Setting Test
|
||
HV.SRP.MULTI-2.A
|
Set 2 Multifunction Relay
Acceptance Test
|
||
HV.SRP.MULTI-2.F
|
Set 2 Multifunction Relay Final
Setting Test
|
||
HV.SRP.DIF-1.A
|
Set 1 Differential Relay Acceptance Test
|
||
HV.SRP.DIF-1.F
|
Set 1 Differential Relay Final Setting Test
|
||
HV.SRP.DIF-2.A
|
Set 2 Differential Relay Acceptance Test
|
||
HV.SRP.DIF-2.F
|
Set 2 Differential Relay Final
Setting Test
|
||
HV.SRP.OC.A
|
Overcurrent And Earth Fault Relay
Acceptance Test
|
||
HV.SRP.OC.F
|
Overcurrent And Earth Fault Relay
Final Setting Test
|
||
HV.SRP.NOC.A
|
Neutral Overcurrent Relay
Acceptance Test
|
||
HV.SRP.NOC.F
|
Neutral Overcurrent Relay Final
Setting Test
|
||
HV.SRP.REF
|
Restricted Earth Fault Relay Test
|
||
HV.SRP.CTSUP-1
|
Set 1 CT Supervision Relay Test
|
||
HV.SRP.CTSUP-2
|
Set 2 CT Supervision Relay Test
|
||
HV.SRP.MS
|
Metrosil Test
|
||
HV.LP.UV/OV
|
Undervoltage And Overvoltage Relay
Test
|
||
EHV.TEEP
|
EHV TEE Protection
|
EHV.TEEP.DIF-1.A
|
Set 1 Differential Relay
Acceptance Test
|
EHV.TEEP.DIF-1.F
|
Set 1 Differential Relay Final
Setting Test
|
||
EHV.TEEP.DIF-2.A
|
Set 2 Differential Relay
Acceptance Test
|
||
EHV.TEEP.DIF-2.F
|
Set 2 Differential Relay Final
Setting Test
|
||
EHV.TEEP.CTSUP-1
|
Set 1 CT Supervision Relay Test
|
||
EHV.TEEP.CTSUP-2
|
Set 2 CT Supervision Relay Test
|
||
EHV.TEEP.MS
|
Metrosil Test
|
||
BDP
|
Bus Duct Protection
|
BDP.DIF-1.A
|
Set 1 Differential Relay
Acceptance Test
|
BDP.DIF-1.F
|
Set 1 Differential Relay Final
Setting Test
|
||
BDP.DIF-2.A
|
Set 2 Differential Relay
Acceptance Test
|
||
BDP.DIF-2.F
|
Set 2 Differential Relay Final
Setting Test
|
||
BDP.CTSUP-1
|
Set 1 CT Supervision Relay Test
|
||
BDP.CTSUP-2
|
Set 2 CT Supervision Relay Test
|
||
BDP.MS
|
Metrosil Test
|
||
EHV.ETRP
|
EHV Earthing Transformer
Protection
|
EHV.ETRP.OC.A
|
Overcurrent And Earth Fault Relay Acceptance Test
|
EHV.ETRP.OC.F
|
Overcurrent And Earth Fault Relay Final Setting Test
|
||
EHV.ETRP.EF.A
|
Earth Fault Relay Acceptance Test
|
||
EHV.ETRP.EF.F
|
Earth Fault Relay Final Setting
Test
|
||
EHV.ETRP.REF
|
Restricted Earth Fault Relay Test
|
||
AVC
|
Automatic Voltage Regulator
|
AVC.A
|
AVC Relay Acceptance Test
|
AVC.F
|
AVC Relay Final Setting Test
|
||
ASE
|
Auto Switching Equipment Relay
|
ASE.TEST
|
Auto Switching Equipment Relay
Test
|
HV.BSBCP
|
HV Bus Section And Bus Coupler
Protection
|
HV.BSBCP.OC.A
|
Overcurrent And Earth Fault Relay
Acceptance Test For HV BC And BS
|
HV.BSBCP.OC.F
|
Overcurrent And Earth Fault Relay
Final Setting Test For HV BC And BS
|
||
HV.BSBCP.UV
|
Undervoltage Relay Test
|
||
EHV.BBP
|
EHV Bus Bar Protection
|
EHV.BBP.LI.BU-1
|
Set 1 Low Impedance BBP Bay Unit
Relay Test
|
EHV.BBP.LI.BU-2
|
Set 2 Low Impedance BBP Bay Unit
Relay Test
|
||
EHV.BBP.LI.CU-1
|
Set 1 Low Impedance BBP Central
Unit Relay Test
|
||
EHV.BBP.LI.CU-2
|
Set 2 Low Impedance BBP Central
Unit Relay Test
|
||
EHV.BBP.HI-1
|
Set 1 High Impedance BBP Test
|
||
EHV.BBP.HI-2
|
Set 2 High Impedance BBP Test
|
||
EHV.BBP.MS
|
Metrosil Test
|
||
EHV.BBP.CTSUP-1
|
Set 1 CT Supervision Relay Test
For BBP
|
||
EHV.BBP.CTSUP-2
|
Set 2 CT Supervision Relay Test
For BBP
|
Sunday, 10 January 2016
Required Electrical & Mechanical tests for Substation Equipments (3)
Subscribe to:
Post Comments (Atom)
The necessary response to substation problems
When it comes to power distribution, substations are the backbone of our grid. Keeping them in optimal condition is essential to ensure re...
Labels
- substation material (7)
- transformers (6)
- cable (5)
- gas insulated switchgear (5)
- transmission lines (4)
- SF6 (3)
- inspection (3)
- safety (2)
- specifications (2)
- current transformer (1)
- education (1)
- electrical hazard (1)
- grounding (1)
-
Trench Construction: The cable trench may be precast (Preferred) or poured in place (Non Preferrred). Poured-in-place trench walls t...
-
1. PURPOSE: The purpose of this procedure is to verify functions of Metal Enclosed Bus Duct. 2. AP...
-
PHOTO for ABB xlpe-submarine cable Scope This specification defines the mandatory requirements for the design, manufacture,factory inspect...
No comments: