Adorama.com INT

2

money

Sunday, 6 September 2015

PACKING AND SHIPPING FOR NEW EQUIPMENTS

 For another Equipment check our Archive ,Labels $ search

       All equipment/material shall be delivered within a period not exceeding two (2)years from date of completion of manufacture.

·        Export packing and shipping shall be adequate for sea transport and handling up to site
·        Each assembly or component shall be skidded, crated, boxed or otherwise suitably protected against damage or loss during shipment and to facilitate field hand storage.
·         All openings shall be effectively sealed with temporary closures to
prevent entry of dust, dirt, moisture and other foreign matter.
Each crate or container shall be marked with the number of pieces contained therein, the manufacturer’s catalog number and description of the content, the manufacturer's name, Country of origin, TBU Item Number, TBU Purchase Order Number, Contract No. or J.O. No. and the gross weight in kg.
·        Additional handling and shipping instructions if specified in SOW/TS or in
Purchase Order and/or by Materials Management Department, or other concerned departments, shall also be applicable.
·        All documentations such as manuals, catalogues, etc. shall be submitted
·        in hard copy and electronic copy in Acrobat Reader format.
·        All dimensions shall be in SI units.

No comments:

omar

Libertex [CPS] WW

Sponcer

button

tele

Lycamobile's SIM Only Plan For $9.90 - Limited Offer - 66% off on SIM+Plan. Grab your Prepaid SIM Deal now!

The necessary response to substation problems

  When it comes to power distribution, substations are the backbone of our grid. Keeping them in optimal condition is essential to ensure re...